黄色免费国产视频-国产成人久久久久-青操在线视频-国产伊人99|www.m5ii.com

深圳市立翔制冷設(shè)備有限公司歡迎您

中文English

加入收藏 | 網(wǎng)站地圖

持續(xù)推動(dòng)行業(yè)轉(zhuǎn)型升級(jí)打造行業(yè)品牌

新聞動(dòng)態(tài)

聯(lián)系我們

銷(xiāo)售服務(wù)熱線(xiàn) :0755-29372978

公司地址:深圳光明新區(qū)公明街道李松蓢第二工業(yè)區(qū)41棟鳳湯路19號(hào)中懋永強(qiáng)科技園3樓B座
服務(wù)手機(jī):13430426495 18923477282
電話(huà):0755-29372978
傳真:0755-29372978

當(dāng)前位置:首頁(yè) > 

Eight skills of daily maintenance of cold water machine

時(shí)間:2016-01-18  來(lái)源:立翔制冷
分享到:

Cold water machine as a water cooling equipment, widely used in family, machinery and chemical industry and so on, cold water machine is has brought great convenience for our life, both in the chemical industry or in the medical industry, cold water machine maintenance and maintenance is essential and what chemical cold water machine, how can it be maintained?
1, air-cooled chiller unit boot should the fan to see whether the correct steering, such as being transferred to start running, inversion is illustrated in power supply wiring, must replace the phase sequence restart.
2, the unit of the protection device set the value of the plant has been set up well, users do not arbitrarily change.
3, unit failure alarm, press the stop button on the unit (alarm lamp will be extinguished), and then check the cause of the fault, the fault is not excluded before the forced boot operation.
4, unless an emergency shall not by cutting off the main power source to shut down the unit; if the unit in the winter time stop to shut down the machine, and then close the main power supply and system of water placed do.
5, to keep the room clean and well ventilated, regular cleaning of condenser in masonry work, ensure the stable work of the unit.
6, water-cooled chillers confidential keep clean cooling water tower, and keep the flow of air around the tower, low temperature to avoid debris into the cooling tower to reduce heat dissipation efficiency.
7, air-cooled chiller, please keep the chiller cooling coil surface clean, ensure the flow of air around the, low temperature, regular cleaning fouling on the coil, in order to ensure the good effect of heat transfer.
8, such as the cold water machine has been used for more than six months, or high / low voltage switch often fail, or cooling capacity to reduce, please arrange for staff to clean the condenser. If repeated in accordance with the above instructions for repair, cold water machine fault warning still ringing, that we must please professional maintenance of cold water machine repaired.
上一篇:

已經(jīng)是第一篇了

下一篇:

已經(jīng)是最后一篇了

公司地址:深圳市寶安區(qū)燕羅街道燕川社區(qū)紅湖路168號(hào)3棟廠(chǎng)房201
電話(huà):0755-29372978 服務(wù)手機(jī):13430426495 18923477282 傳真:0755-29372978
版權(quán)所有:粵ICP備16006913號(hào)